New Office: Preparations

by Oliver -

A lot is happening right now. For example, Boinx Software will move to new offices end of January. Many things need to be prepared. The Internet line needs to be installed. (There will be a 4.6Mbps SDSL line) Walls need to be moved. A 19" rack will be installed for our servers. The walls need to be painted. And the network needs to be wired.

Here are some pictures of what's going to be the new office. This is the door:

Officeentry

This is the main room:

Office1

Office2

The office you can see through the door will be my office. I am very excited. More pictures as we progress with the preparations.